The power systems of Lithuania, Latvia, and Estonia have been operating in so-called isolated mode since Saturday. Further technical tests...
The first water quality testers at Warsaw Waterworks are the fish and mussels located in its facilities. These organisms are...
The Estlink 2 power cable running along the Baltic Sea floor has been severed, its operator reported. The connection failure...
A fiber-optic cable connecting Finland and Sweden suffered damage on the Finnish mainland on Monday, Swedish Radio reported on Tuesday....
Prime Minister Donald Tusk announced that a grain terminal will be established at the Port of Gdańsk, operated by Port...
On 29 November 2024, Lithuania and Rheinmetall marked the beginning of construction for a cutting-edge production plant dedicated to 155mm...
China's ambassador to Hungary, Gong Tao, visited Szeged (southern Hungary) last Thursday, where he was received by Mayor László Botka....
The Technology of the Capital City of Prague (THMP) is spearheading an ambitious project to significantly expand the city's network...
Central Europe is currently grappling with severe floods, causing widespread destruction and displacing thousands of people across several countries. Heavy...
Ukrainian Danube river ports exported a record three million tonnes of food in May due to a slowdown in exports...
Dofinansowano ze środków z budżetu państwa ogólna rezerwa budżetowa.
Zadanie: Rozwój działań Centrum Medialnego Fundacji Action-Life
zostało sfinansowane ze środków budżetu państwa
z ogólnej rezerwy budżetowej.
Dofinansowanie:
2 481 140,00 zł.
Całkowita wartość zadania:
2 481 140,00 zł.
Data podpisania umowy: 3.04.2023 r.