• About
  • Contact
  • Privacy policy
No Result
View All Result
Central Eastern Europe News

CENTRAL EASTERN EUROPE NEWS

  • Macroeconomics
  • Infrastructures
  • Defence
  • Agriculture
  • Energy
  • Politics
  • Logistics
  • Macroeconomics
  • Infrastructures
  • Defence
  • Agriculture
  • Energy
  • Politics
  • Logistics
No Result
View All Result
Central Eastern Europe News
No Result
View All Result

Massive Blackout Paralyzes Prague and Northern Czechia

2025/07/04
in Energy

Czechia experienced a sweeping blackout that disrupted daily life across Prague and regions in northern and eastern Bohemia. The blackout originated just before noon local time when a high-voltage transmission line, part of the V411 grid, collapsed near the Ledvice power plant and triggered a cascading failure affecting multiple substations and even a generation unit. Within minutes, eight substations—including one in Prague and others across the Central Bohemian, Liberec, Ústí nad Labem, and Eastern Bohemian regions—lost power, plunging homes, businesses, trains, trams, and the metro into darkness.

The capital’s transportation network shut down entirely: Prague’s subway system halted for approximately 30 minutes before partial recovery, while tram lines—especially on the city’s right bank of the Vltava—remained immobilized for hours. Train services between Prague and nearby cities such as Kolín and Kutná Hora were suspended, and traffic signals failed in several towns, compounding travel chaos.. Over 200 incidents of people trapped in elevators were reported, though all were rescued safely by firefighters . Hospitals swiftly switched to backup generators, and prison security remained unaffected despite power losses .

Despite fears of cyberattacks or terrorism, Czech officials, including the national grid operator CEPS and Interior Minister Vít Rakušan, affirmed the cause was mechanical—a fallen high-voltage cable and subsequent overload—not external interference.. Industry and Trade Minister Lukáš Vlček described the blackout as the result of a „mechanical malfunction” and suggested heat stress or equipment fatigue could be contributing factors.

Power restoration efforts proceeded swiftly. By 13:00 GMT (14:00 CEST), all affected transmission substations had regained electricity, and most local services in Prague resumed by early afternoon, with full recovery expected later that same day. CEPS and Prime Minister Petr Fiala quickly established a crisis response, declaring the situation “extraordinary and unpleasant,” and confirmed a comprehensive state of emergency was enacted. By July 5, full service had been restored to households, infrastructure, and rail operations.

However, the outage reignited widespread concerns about the resilience of Czech and European energy infrastructure. Experts highlighted the need for modernization of aging grid systems, greater investment in smart technologies, and improved energy storage to handle imbalances—especially during low-demand summer periods amid high solar output . Analysts drew parallels with recent blackouts in Spain and disruptions at London’s Heathrow, warning that Europe must prepare for similar cascading failures.

As Czechia recovers from this incident, authorities have launched an investigation into the precise causes and consequences of the chain reaction, promising to release findings in the coming days. In the meantime, officials underscore that emergency protocols worked effectively—backup power systems held, transportation services were rapidly restored, and no casualties were reported.

Author

  • ceenewsadmin
    ceenewsadmin

ShareTweet

Follow us

845.3K Followers

25K Fans

19.9K Subscribers

Popular Stories

  • Welder. Illustrative

    Hungary Wins €30m Military Manufacturing Deal

    0 shares
    Share 0 Tweet 0
  • Chopin’s lasting influence on Polish Culture

    0 shares
    Share 0 Tweet 0
  • North Macedonia: an Economic Boom in a Nutshell

    0 shares
    Share 0 Tweet 0
  • Is European Defence Up To It?

    0 shares
    Share 0 Tweet 0
  • Growing Without Soil: The Rise of Aquaponics and Hydroponics in CEE

    0 shares
    Share 0 Tweet 0

Publisher

Fundacja Action-Life
Ul. Jodłowa 23B
02-907 Warszawa

kontakt@fundacjaactionlife.pl

Last posts

Tensions Rise at Polish-German Border as Citizen Patrols Respond to Migrant Pushbacks

Slovenian Prime Minister Proposes NATO Referendum: „Either We Pay, or We Leave”

Georgia Blocks Entry for Ukrainians Deported by Russia: Dozens Stranded at Border

Massive Blackout Paralyzes Prague and Northern Czechia

Information

Dofinansowano ze środków z budżetu państwa ogólna rezerwa budżetowa.
Zadanie: Rozwój działań Centrum Medialnego Fundacji Action-Life zostało sfinansowane ze środków budżetu państwa z ogólnej rezerwy budżetowej.
Dofinansowanie:
2 481 140,00 zł.
Całkowita wartość zadania:
2 481 140,00 zł.
Data podpisania umowy: 3.04.2023 r.

  • About
  • Contact
  • Privacy policy

No Result
View All Result
  • Macroeconomics
  • Infrastructures
  • Defence
  • Agriculture
  • Energy
  • Politics
  • Logistics